Week 1
This first week was used to select a space. This took some time because I thought the living room provided more details due to the type of furniture and an accent wall, however I ended up choosing my bedroom. After choosing a space, I then proceeded to measure the space.
Week 2,3,4
These 3 weeks were dedicated to finishing all the drawings. Week 2 was dedicated to finishing the floor plan, and one elevation drawing, week 3 was dedicated to the other elevation drawing and the section drawing, and week 4 was dedicated to the final drawings of the loose furniture.
Week 5
During the final week with all the drawings complete, I then compiled the scanned pictures of the drawings and put them onto a powerpoint document, to prepare for submission.