ITD FINAL ASSIGNMENT - MICRO HOUSE PROJECT
Week 1
This first week was dedicated to discussing about the details needed for our individual parts. Such as the location of the site, finalising the title block, choosing a layout, all the materials we plan to use and the furniture for the space.
Week 2
The second week after receiving the assignment was used for me to compile all the information and decisions we had made as a group into a powerpoint document, so that everyone was clear on our direction weren't lost or unsure in any way.
Week 3-4
These two weeks was where most of the work was done. I planned my time as i had other assignments ongoing at the same time, and that plan was to finish all the drawings and leave the last week for inking the drawings and correcting them if needed. However, I got caught up in my other assignments that I only managed to finish 3 drawings.
Week 5
This final week was a hectic one, as I had to complete the final two drawings and ink the rest of them as well. Luckily, I was able to complete all of them in time. After inking all of the drawings, I then proceeded to scan all the drawings and compile them into the powerpoint document created in the earlier stages.
bottom of page